English
·
Colt Group
Home
I
Contact
I
Legal Notice
I
Search
I
Site Map
Choose a Colt worldwide location
Projects
>
Manufacturing
>
Smelters
>
Projects
>
Nordural
Nordural Nordic Aluminium
Iceland
Case History
PROJECT :
Nordural Nordic Aluminium
PROJECT LOCATION :
Iceland
THE COLT SOLUTION :
Gravity (natural) ventilation units
COLT PRODUCTS USED :
Colt Labyrinth
EXISTING ALUMINIUM SMELTER
CONSTRUCTION OF A NEW
ALUMINIUM SMELTER
AIR SUPPLY
The existing ventilation openings at the aluminium smelter of Nordural Nordic Aluminium in Iceland no longer satis-fied current requirements.
At Nordural's request, Colt implemen-ted a solution. Keeping the need for additional constructional provision to a minimum, Colt replaced the ventilation openings in this building with gravity ventilation units, type Colt Labyrinth.
This comprised 780 metres in total.
Afterwards, Colt was asked to also fit a gravity ventilation system to the new building, construction of which had already begun.
The Labyrinth fitted to the new building comprised approximately 1200 metres with a roof opening of 4.5 metres.
For the openings in the basement, Colt supplied 934 natural air supply grilles measuring 3 metres wide and 1.4 metres high.
These grilles meet extremely high standards. Tests resulted in the following technical data:
Windload: 2 KN/m˛
Life cycles: 30,000
Rain and wind test: 75 mm/hr with 13 m/s wind
© 2008 Colt International Licensing Ltd - People feel better in Colt conditions
|
Top
|
Back
|
Print
About
Products and Systems
Projects
Airports
Art Galleries and Exhibition Halls
Car Parks
Education Buildings
Hospitals, Health Buildings
Hotels
Infrastructure, Rail, Bus
Manufacturing
Metal
Smelters
Projects
Research
Photo Impression
Offices
Public Buildings
Residential Buildings
Retail, Shopping Centres
Sports Stadia & Leisure
Theatres
Warehouses
News
Offices
The Colt Vision
History
Colt Foundation