Colt Holland has worked with Corus on various projects, and this project has been undertaken in seven phases, with the largest phase being the most recent.
Read more..
When the factory was being built, Colt installed a natural smoke control system into the northlight glazing.
The building consists of a main production hall, goods transfer, storage and administration centre. In order to reduce the high temperatures reached within the production hall, Colt was asked to design a ventilation scheme.
Colt was asked to design and install a ventilation system to improve the working conditions in the new factory area.